HASIL KERJA PROYEK UNILEVER HARI SENIN 30 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG, CLIPLOCK,
- PASANG BEGEL TALANG, LISPLANK, REPAIR CAT
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI SELASA 31 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG ZINCALUM CLIPLOCK,
- PASANG BEGEL TALANG, TALANG STAINLESS STEEL, REPAIR CAT
- PEMBERSIHAN LOKASI
Selasa, 31 Mei 2011
Senin, 30 Mei 2011
HASIL KERJA PROYEK UNILEVER HARI MINGGU 29 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG GORDING, TREKSTANG REGEL,
- PASANG BEGEL TALANG, LISPLANK
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI SENIN 30 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG, CLIPLOCK,
- PASANG BEGEL TALANG, LISPLANK, REPAIR CAT
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG GORDING, TREKSTANG REGEL,
- PASANG BEGEL TALANG, LISPLANK
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI SENIN 30 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG, CLIPLOCK,
- PASANG BEGEL TALANG, LISPLANK, REPAIR CAT
- PEMBERSIHAN LOKASI
Minggu, 29 Mei 2011
PROGRAM KERJA HARI MINGGU 29 MEI '11
HASIL KERJA PROYEK UNILEVER HARI SABTU 28 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION LISPLANK, GORDING, REGEL
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI MINGGU 29 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG GORDING, TREKSTANG REGEL,
- PASANG BEGEL TALANG, LISPLANK
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION LISPLANK, GORDING, REGEL
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI MINGGU 29 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- PASANG TREKSTANG GORDING, TREKSTANG REGEL,
- PASANG BEGEL TALANG, LISPLANK
- PEMBERSIHAN LOKASI
Sabtu, 28 Mei 2011
PROGRAM KERJA HARI SABTU 28 MEI '11
HASIL KERJA PROYEK UNILEVER HARI JUM'AT 27 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
- TRANSFER MATERIAL DARI LOADING DOCK KE LANTAI 2 (OK)
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION RAFTER, BEAM, SUPPORT
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI SABTU 28 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION LISPLANK, GORDING, REGEL
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
- TRANSFER MATERIAL DARI LOADING DOCK KE LANTAI 2 (OK)
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION RAFTER, BEAM, SUPPORT
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI SABTU 28 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION LISPLANK, GORDING, REGEL
- PEMBERSIHAN LOKASI
Jumat, 27 Mei 2011
PROGRAM KERJA HARI JUM'AT 27 MEI '11
HASIL KERJA PROYEK UNILEVER HARI KAMIS 26 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
- MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION KOLOM
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 27 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION RAFTER, BEAM, SUPPORT
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
- MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION KOLOM
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 27 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION RAFTER, BEAM, SUPPORT
- PEMBERSIHAN LOKASI
Kamis, 26 Mei 2011
PROGRAM KERJA HARI KAMIS 25 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI RABU 24 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
- MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
- BONGKAR PLAFOND & SENG ZINCALUM
- PERSIAPAN ERECTION KOLOM
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 26 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION KOLOM
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
- MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
- BONGKAR PLAFOND & SENG ZINCALUM
- PERSIAPAN ERECTION KOLOM
- PEMBERSIHAN LOKASI
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 26 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
- MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION KOLOM
- PEMBERSIHAN LOKASI
Rabu, 25 Mei 2011
PROGRAM KERJA HARI RABU 25 MEI '11
HASIL KERJA PROYEK UNILEVER HARI SELASA 24 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT (LANJUT)
- MARKING KUDA2 UNTUK END PLATE KOLOM (LANJUT)
- BONGKAR PLAFOND & SENG ZINCALUM (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI RABU 25 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
- MARKING KUDA2 UNTUK END PLATE KOLOM
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION KOLOM
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT (LANJUT)
- MARKING KUDA2 UNTUK END PLATE KOLOM (LANJUT)
- BONGKAR PLAFOND & SENG ZINCALUM (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI RABU 25 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
- MARKING KUDA2 UNTUK END PLATE KOLOM
- BONGKAR PLAFOND & SENG ZINCALUM
- ERECTION KOLOM
- PEMBERSIHAN LOKASI
Selasa, 24 Mei 2011
PROGRAM KERJA HARI SELASA 24 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI SENIN 23 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SELASA 24 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SELASA 24 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
- PEMBERSIHAN LOKASI
Senin, 23 Mei 2011
PROGRAM KERJA HARI SENIN 23 MEI 2011
RENCANA KERJA PROYEK UNILEVER HARI SENIN 23 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI WORKSHOP KE PROYEK UNILEVER
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
- TRANSFER MATERIAL DARI WORKSHOP KE PROYEK UNILEVER
- TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
- PEMBERSIHAN LOKASI
Sabtu, 21 Mei 2011
PROGRAM KERJA HARI SABTU 21 MEI '11
HASIL KERJA PROYEK UNILEVER HARI JUM'AT 20 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (LANJUT)
- BIKIN TANDA KABEL 10 BH (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SABTU 21 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT / GORONG-GORONG & TUTUP BOX CULVERT
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP & TRANSFER MATERIAL BAJA KE UNILEVER
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (LANJUT)
- BIKIN TANDA KABEL 10 BH (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SABTU 21 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT / GORONG-GORONG & TUTUP BOX CULVERT
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP & TRANSFER MATERIAL BAJA KE UNILEVER
Jumat, 20 Mei 2011
PROGRAM KERJA HARI JUM'AT 20 MEI '11
HASIL KERJA PROYEK UNILEVER HARI KAMIS 19 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- RABAT LANTAI KERJA CROSSING (OK)
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (LANJUT)
- BIKIN TANDA KABEL 10 BH (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 20 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT / GORONG-GORONG & TUTUP BOX CULVERT
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- RABAT LANTAI KERJA CROSSING (OK)
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (LANJUT)
- BIKIN TANDA KABEL 10 BH (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 20 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT / GORONG-GORONG & TUTUP BOX CULVERT
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
Kamis, 19 Mei 2011
PROGRAM KERJA HARI KAMIS 19 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI RABU 18 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (OK)
- RABAT LANTAI KERJA CROSSING (OK)
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 19 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT / GORONG-GORONG & TUTUP BOX CULVERT
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (OK)
- RABAT LANTAI KERJA CROSSING (OK)
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 19 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- PASANG BOX CULVERT / GORONG-GORONG & TUTUP BOX CULVERT
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
Rabu, 18 Mei 2011
PROGRAM KERJA HARI RABU 18 MEI '11
HASIL KERJA PROYEK UNILEVER HARI SENIN 16 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA CROSSING (LANJUT)
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (OK)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI RABU 18 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA CROSSING (LANJUT)
- PASANG BOX CULVERT/ U~DITH (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- URUGAN KEMBALI GALIAN (OK)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI RABU 18 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
Senin, 16 Mei 2011
PROGRAM KERJA HARI SENIN 16MEI 2011
HASIL KERJA PROYEK UNILEVER HARI MINGGU 15 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA CROSSING JALAN (LANJUT)
- PASANG BOX CULVERT/ U~DITH CROSSING JALAN (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT CROSSING JALAN (LANJUT)
- URUGAN KEMBALI GALIAN CROSSING JALAN (OK)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SENIN 16 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA CROSSING JALAN (LANJUT)
- PASANG BOX CULVERT/ U~DITH CROSSING JALAN (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT CROSSING JALAN (LANJUT)
- URUGAN KEMBALI GALIAN CROSSING JALAN (OK)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SENIN 16 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
- URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
Minggu, 15 Mei 2011
PROGRAM KERJA HARI MINGGU 15 MEI '11
HASIL KERJA PROYEK UNILEVER HARI SABTU 14 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN COVER BOX CULVERT DARI TRUCK 48 BH
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
RENCANA KERJA PROYEK UNILEVER HARI MINGGU 15 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- GALIAN TANAH DENGAN EXCAVATOR PC 75 CROSSING JALAN (MENGGANGGU LALU LINTAS MOBIL KELUAR MASUK PROYEK)
- PASANG BOX CULVERT / GORONG-GORONG CROSSING JALAN
- GROUTING SAMBUNGAN BOX CULVERT CROSSING JALAN
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN COVER BOX CULVERT DARI TRUCK 48 BH
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
RENCANA KERJA PROYEK UNILEVER HARI MINGGU 15 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- GALIAN TANAH DENGAN EXCAVATOR PC 75 CROSSING JALAN (MENGGANGGU LALU LINTAS MOBIL KELUAR MASUK PROYEK)
- PASANG BOX CULVERT / GORONG-GORONG CROSSING JALAN
- GROUTING SAMBUNGAN BOX CULVERT CROSSING JALAN
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
Sabtu, 14 Mei 2011
PROGRAM KERJA HARI KAMIS 12 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI RABU 11 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 12 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 12 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
PROGRAM KERJA HARI SABTU 14 MEI '11
HASIL KERJA PROYEK UNILEVER HARI JUM'AT 13 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN COVER BOX CULVERT DARI TRUCK 56 BH
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
RENCANA KERJA PROYEK UNILEVER HARI SABTU 14 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN COVER BOX CULVERT DARI TRUCK 56 BH
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORKSHOP
RENCANA KERJA PROYEK UNILEVER HARI SABTU 14 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- BIKIN TANDA KABEL 10 BH
> KOORDINASI PEKERJAAN ROOF MODUL 7
- PABRIKASI DI WORK SHOP
Rabu, 11 Mei 2011
PROGRAM KERJA HARI RABU 11 MEI '11
HASIL KERJA PROYEK UNILEVER HARI SELASA 10 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI RABU 11 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
- RENC. PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI RABU 11 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- GALIAN TANAH DENGAN EXCAVATOR PC 75
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
- RENC. PABRIKASI DI WORK SHOP
Selasa, 10 Mei 2011
PROGRAM KERJA HARI SELASA 10 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI SENIN 09 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI SELASA 10 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
- RENC. PABRIKASI DI WORK SHOP
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI SELASA 10 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
- MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
- RENC. PABRIKASI DI WORK SHOP
Senin, 09 Mei 2011
PROGRAM KERJA HARI SENIN 9 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI SABTU 07 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI SENIN 09 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
- RENC. PABRIKASI DI WORK SHOP JIKA MATERIAL TELAH DATANG
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI SENIN 09 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
- RENC. PABRIKASI DI WORK SHOP JIKA MATERIAL TELAH DATANG
Sabtu, 07 Mei 2011
PROGRAM KERJA HARI SABTU 7 MEI '11
HASIL KERJA PROYEK UNILEVER HARI JUM'AT 06 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- MENURUNKAN BOX CULVERT DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI SABTU 07 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- MENURUNKAN BOX CULVERT DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI SABTU 07 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
Jumat, 06 Mei 2011
PROGRAM KERJA HARI JUM'AT 6 MEI '11
HASIL KERJA PROYEK UNILEVER HARI KAMIS 05 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 06 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI PEKERJAAN ROOF MODUL 7
RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 06 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
Kamis, 05 Mei 2011
PROGRAM KERJA HARI KAMIS 5 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI RABU 04 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG (45 BH) (OK)
DAN TUTUP 20 BH
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 05 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
- MENURUNKAN BOX CULVERT DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG (45 BH) (OK)
DAN TUTUP 20 BH
RENCANA KERJA PROYEK UNILEVER HARI KAMIS 05 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
- MENURUNKAN BOX CULVERT DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
Rabu, 04 Mei 2011
PROGRAM KERJA HARI RABU 4 MEI '11
HASIL KERJA PROYEK UNILEVER HARI SELASA 03 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG (45 BH) (OK)
DAN TUTUP 20 BH
RENCANA KERJA PROYEK UNILEVER HARI RABU 04 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG (45 BH) (OK)
DAN TUTUP 20 BH
RENCANA KERJA PROYEK UNILEVER HARI RABU 04 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- PASANG BOX CULVERT / GORONG-GORONG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
Selasa, 03 Mei 2011
PROGRAM KERJA HARI SELASA 3 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI SENIN 2 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- MENURUNKAN BOX CULVERT / GORONG-GORONG DARI TRUK (45 BH) (OK)
DAN TUTUP 20 BH
RENCANA KERJA PROYEK UNILEVER HARI SENIN 03 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
- MENURUNKAN BOX CULVERT / GORONG-GORONG DARI TRUK (45 BH) (OK)
DAN TUTUP 20 BH
RENCANA KERJA PROYEK UNILEVER HARI SENIN 03 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
Senin, 02 Mei 2011
PROGRAM KERJA HARI SENIN 2 MEI 2011
HASIL KERJA PROYEK UNILEVER HARI SABTU 30 APRIL 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SENIN 02 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
- RABAT LANTAI KERJA (LANJUT)
- PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
- GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
- PEMBERSIHAN LOKASI (LANJUT)
RENCANA KERJA PROYEK UNILEVER HARI SENIN 02 MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
- SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
- RABAT LANTAI KERJA
- GROUTING SAMBUNGAN BOX CULVERT
- URUGAN TANAH KEMBALI
- PEMBERSIHAN LOKASI
Langganan: