Kamis, 30 Juni 2011

PROGRAM KERJA HARI KAMIS 30 JUNI 2011

RENCANA KERJA  HARI KAMIS 30 JUNI 2011 :

    - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV  KE PW (BY PHONE)
     - PROSES SERAH TERIMA & MENANYAKAN PK PEK. PEMASANGAN ACRILIC R. FASILITATOR & R. ENTRANCE PRODUKSI DENGAN (P. AGUS WAHYUDI, P. BAGIO, P. SAMSUL, USER) ---> PROSES
     - STANBAY DIKANTOR

Selasa, 28 Juni 2011

PROGRAM KERJA HARI SELASA 28 JUNI 2011

RENCANA KERJA  HARI SELASA 28 JUNI 2011 :

     - KOORDINASI JADWAL MOBIL UNTUK BAWA ALAT KE GUDANG & AKRILIC SISA
    - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV  KE PW (BY PHONE)
     - PROSES SERAH TERIMA PEK. PEMASANGAN ACRILIC R. FASILITATOR & R. ENTRANCE PRODUKSI DENGAN (P. AGUS WAHYUDI, P. BAGIO, P. SAMSUL, USER) ---> PROSES

Senin, 27 Juni 2011

PROGRAM KERJA HARI SENIN 27 JUNI 2011

RENCANA KERJA  HARI SENIN 27 JUNI 2011 :

     - KOORDINASI PENGEMBALIAN ALAT DI UNILEVER KE GUDANG & BAWA VACUM CLEANER KE KANTOR
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV  KE PW
     - PROSES SERAH TERIMA PEK. PEMASANGAN ACRILIC R. FASILITATOR & R. ENTRANCE PRODUKSI DENGAN (P. AGUS WAHYUDI, P. BAGIO, P. SAMSUL, USER)

Sabtu, 25 Juni 2011

PROGRAM KERJA HARI SABTU 25 JUNI 2011 UNILEVER PEOJECT

HASIL KERJA  HARI JUM'AT 24 JUNI 2011 :
     - KOORDINASI PEMASANGAN STIKER DI ACRILIC DENGAN USER (OK)
     - KOORDINASI PENGADAAN FLIP CHART DENGAN PIHAK TERKAIT UNTUK UNILEVER (OK) 
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - PROSES SERAH TERIMA PEK. PEMASANGAN ACRILIC R. FASILITATOR & R. ENTRANCE PRODUKSI DENGAN (P. AGUS WAHYUDI, P. BAGIO, P. SAMSUL, USER)
     - KOORDINASI BIKIN OPNAM PEKERJA UNILEVER

RENCANA KERJA  HARI SABTU 25 JUNI 2011 :

     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV  KE PW
     - PROSES SERAH TERIMA PEK. PEMASANGAN ACRILIC R. FASILITATOR & R. ENTRANCE PRODUKSI DENGAN (P. AGUS WAHYUDI, P. BAGIO, P. SAMSUL, USER)
     - KEKANTOR AMBIL OPNAM

Jumat, 24 Juni 2011

PROGRAM HARI JUM'AT 24 JUNI 2011 UNILEVER PROJECT

HASIL KERJA  HARI KAMIS 23 JUNI 2011 :
     - KOORDINASI PEMASANGAN STIKER DI ACRILIC DENGAN USER (MENUNGGU STIKER MASIH PROSES,LANJUT)
     - KOORDINASI PENGADAAN FLIP CHART DENGAN PIHAK TERKAIT UNTUK UNILEVER (SUDAH DIKIRIM TINGGAL PENEMPATAN MASIH ADA TAMU, BELUM BISA BAWA KE RUANGAN)
     - KOORDINASI DENGAN PENGAWAS PENGAMBILAN BAST PEK. ADD FASILITATOR ROOM PC (OK, DT SUDAH KELUAR)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (OK SUDAH KELUAR)
     - MENANYAKAN PO ADD INSTALL GORONG2 KE P. EKO PW

RENCANA KERJA  HARI JUM'AT 24 JUNI 2011 :

     - KOORDINASI PEMASANGAN STIKER DI ACRILIC DENGAN USER
     - KOORDINASI PENGADAAN FLIP CHART DENGAN PIHAK TERKAIT UNTUK UNILEVER (PENEMPATAN KE RUANGAN) 
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - PROSES SERAH TERIMA PEK. PEMASANGAN ACRILIC R. FASILITATOR & R. ENTRANCE PRODUKSI DENGAN (P. AGUS WAHYUDI, P. BAGIO, P. SAMSUL, USER)

Kamis, 23 Juni 2011

PROGRAM KERJA HARI KAMIS 23 JUNI 2011

RENCANA KERJA  HARI KAMIS 23 JUNI 2011 :

     - (KOORDINASI PEMASANGAN STIKER DI ACRILIC DENGAN USER)
     - KOORDINASI PENGADAAN FLIP CHART DENGAN PIHAK TERKAIT UNTUK UNILEVER (SATU KONDISI RUSAK DIKEMBALIKAN, RENC HARI INI DI KIRIM YANG BAGUS)
     - KOORDINASI DENGAN PENGAWAS PENGAMBILAN BAST PEK. ADD FASILITATOR ROOM PC (P. AGUS WAHYUDI)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (MASIH DALAM PROSES)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
 

Rabu, 22 Juni 2011

PROGRAM KERJA HARI RABU 22 JUNI 2011 UNILEVER PROJECT

RENCANA KERJA  HARI RABU 22 JUNI 2011 :

     - KOORDINASI PEKERJAAN PEMASANGAN ACRILIC R. FASILITATOR & ENTRANCE R.PRODUKSI 
     - KOORDINASI PENGADAAN FLIP CHART DENGAN PIHAK TERKAIT UNTUK UNILEVER
     - KOORDINASI DENGAN PENGAWAS PENGAMBILAN BAST PEK. ADD FASILITATOR ROOM PC (P. AGUS WAHYUDI)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (MASIH DALAM PROSES)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
   

Selasa, 21 Juni 2011

PROGRAM KERJA HARI SELASA 21 JUNI 2011

RENCANA KERJA  HARI SELASA 21 JUNI 2011 :

     - KOORDINASI PEKERJAAN TAMBAH PEMASANGAN ACRILIC R. FASILITATOR & ENTRANCE R.PRODUKSI (KLARIFIKASI PENAWARAN ACRILIC R.FASILITATOR & ENTRANCE PRODUKSI)
     - KOORDINASI DENGAN PENGAWAS PENGAMBILAN BAST PEK. ADD FASILITATOR ROOM PC (P. AGUS WAHYUDI)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (hari sabtu informasi sudah mulai masuk kantor, tetapi masih perawatan di poliklinik, belum aktifitas)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - MEMPELAJARI RENC. PEK. JEMBATAN GEDANGAN II

Senin, 20 Juni 2011

PROGRAM KERJA HARI SENIN 20 JUNI 2011

RENCANA KERJA  HARI SENIN 20 JUNI 2011 :

     - KOORDINASI PENAWARAN DENGAN PERENCANAAN PEKERJAAN TAMBAH PEMASANGAN ACRILIC R. FASILITATOR & ENTRANCE R.PRODUKSI (RENC. KITA MASUKKAN PENAWARAN KE P. SAMSUL & P. BAGIO).
     - KOORDINASI DENGAN PENGAWAS PENGAMBILAN BAST PEK. ADD FASILITATOR ROOM PC (P. AGUS WAHYUDI)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (hari sabtu informasi sudah mulai masuk kantor, tetapi masih perawatan di poliklinik, belum aktifitas)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - MEMPELAJARI RENC. PEK. JEMBATAN GEDANGAN II

Sabtu, 18 Juni 2011

PROGRAM KERJA HARI SABTU 18 JUNI 2011 PROYEK UNILEVER

RENCANA KERJA PROYEK UNILEVER HARI SABTU 18 JUNI 2011 :

     - KOORDINASI DENGAN P. SAMSUL, P. BAGIO, P. WARAS FASILITATOR RENCANA ADA PEKERJAAN TAMBAH PEMASANGAN ACRILIC R. FASILITATOR & ENTRANCE R.PRODUKSI.
     - KOORDINASI DENGAN PENGAWAS PROSES BAST & CEKLIST PEK. ROOF MODUL 7 (menunggu DT dari PC factory)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (Petugas DT sudah 12 hari tidak masuk karena sakit, informasi hari ini sudah mulai masuk kantor lagi)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - MENANYAKAN BAST PEK. ADD FASILITATOR KE P. AGUS WAHYUDI

Jumat, 17 Juni 2011

PROGRAM KERJA HARI JUM'AT 17 JUNI 2011

RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 17 JUNI 2011 :


     - KOORDINASI DENGAN PENGAWAS PROSES BAST & CEKLIST PEK. ROOF MODUL 7 (menunggu DT dari PC factory)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (Petugas DT sudah 12 hari tidak masuk karena sakit, informasi hari ini sudah mulai masuk kantor lagi)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - MENANYAKAN BAST PEK. ADD FASILITATOR KE P. AGUS WAHYUDI
     - BIKIN OPNAM PEKERJA UNILEVER

Kamis, 16 Juni 2011

PROGRAM KERJA HARI KAMIS 16 JUNI 2011 UNILEVER PROJECT

RENCANA KERJA PROYEK UNILEVER HARI KAMIS 16 JUNI 2011 :


> KOORDINASI PEKERJAAN ROOF MODUL 7
  
   - KOORDINASI DENGAN PENGAWAS PERBAIKAN LAPISAN AQUAPROOF
     - KOORDINASI DENGAN PENGAWAS PROSES BAST & CEKLIST PEK. ROOF MODUL 7
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (Petugas DT sudah 12 hari tidak masuk karena sakit)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - MENANYAKAN BAST PEK. ADD FASILITATOR KE P. AGUS WAHYUDI

Rabu, 15 Juni 2011

PROGRAM KERJA HARI RABU 15 JUNI 2011 UNILEVER PROJECT

RENCANA KERJA PROYEK UNILEVER HARI RABU 15 JUNI 2011 :


> KOORDINASI PEKERJAAN ROOF MODUL 7
  
   - KOORDINASI DENGAN PENGAWAS RENCANA PERBAIKAN LAPISAN AQUAPROOF
     - KOORDINASI DENGAN PENGAWAS PROSES BAST & CEKLIST PEK. ROOF MODUL 7
     - KOORDINASI HASIL FOTO DOK. PEK. ROOF MODUL 7 (PENGAWAS MINTA ARSIP)
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV (Petugas DT sudah 12 hari tidak masuk karena sakit)
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV
     - MENANYAKAN BAST PEK. ADD FASILITATOR

Selasa, 14 Juni 2011

PROGRAM KERJA HARI SELASA 14 JUNI 2011

RENCANA KERJA PROYEK UNILEVER HARI SELASA 14 JUNI 2011 :


> KOORDINASI PEKERJAAN ROOF MODUL 7
  
   - KOORDINASI DENGAN PENGAWAS RENCANA TES KEBOCORAN ATAP ROOF MODUL 7
     - KOORDINASI DENGAN PENGAWAS PROSES BAST & CEKLIST PEK. ROOF MODUL 7
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV

Senin, 13 Juni 2011

PROGRAM KERJA HARI SENIN 13 JUNI 2011

RENCANA KERJA PROYEK UNILEVER HARI SENIN 13 JUNI 2011 :


> KOORDINASI PEKERJAAN ROOF MODUL 7
  
   - KOORDINASI DENGAN PENGAWAS RENCANA TES KEBOCORAN ATAP ROOF MOD 7
     - KOORDINASI DENGAN PENGAWAS PROSES BAST PEK. ROOF MODUL 7
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV

Sabtu, 11 Juni 2011

PROGRAM KERJA HARI SABTU 11 JUNI 2011 PROYEK UNILEVER

HASIL KERJA PROYEK UNILEVER HARI  JUM'AT 10 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
     - MENGUMPULKAN ALAT DAN TRANSFER DARI LOKASI PROYEK KE LOADING DOCK BELAKANG   DAN MEMNAIKKAN KE MOBIL DI BAWA KE GUDANG
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 11 JUNI 2011 :

> KOORDINASI PEKERJAAN ROOF MODUL 7
  
   - KOORDINASI DENGAN PENGAWAS PROSES BAST PEK. ROOF MODUL 7
     - MENANYAKAN KE PW FACTORY DT (Delivery Ticket) (P. ZAINUL) PEK. INSTALL GORONG - GORONG KABEL 20 KV
     - MENYERAHKAN BAST ADD PEK FASILITATOR ROOM PC
     - MENANYAKAN PO (Purchase Order) ADD PEK. INSTALL GORONG2 KABEL 20 KV

Jumat, 10 Juni 2011

PROGRAM KERJA HARI JUM'AT 10 JUNI 2011 PROYEK UNILEVER

HASIL KERJA PROYEK UNILEVER HARI  KAMIS 9 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER BONGKARAN KE GUDANG UNILEVER
   - PERBAIKAN PLAFOND ACOUSTIC EXISTING (TIDAK TERMASUK ITEM PEKERJAAN), PENGAWAS MINTA DI RAPIKAN,
   - MENGUMPULKAN ALAT DAN TRANSFER DARI LOKASI PROYEK KE LOADING DOCK BELAKANG  
   - PEMBERSIHAN LOKASI

RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 10 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
  
   - MENGUMPULKAN ALAT DAN TRANSFER DARI LOKASI PROYEK KE LOADING DOCK BELAKANG   DAN MEMNAIKKAN KE MOBIL DI BAWA KE GUDANG
   - PEMBERSIHAN LOKASI

Kamis, 09 Juni 2011

PROGRAM KERJA HARI KAMIS 9 JUNI 2011

HASIL KERJA PROYEK UNILEVER HARI  RABU 8 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - BONGKAR PLAFOND & SENG ZINCALUM & TRANSFER BONGKARAN
   - PASANG FLASING TALANG DENGAN ATAP EXISTING
   - FINISHING GYPSUM PLAFOND & DINDING
   - FINISHING TANGGA MONYET
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI KAMIS 9 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER BONGKARAN KE GUDANG UNILEVER
   - PERBAIKAN PLAFOND ACOUSTIC EXISTING (TIDAK TERMASUK ITEM PEKERJAAN), PENGAWAS MINTA DI RAPIKAN,

   - MENGUMPULKAN ALAT DAN TRANSFER DARI LOKASI PROYEK KE LOADING DOCK BELAKANG   - PEMBERSIHAN LOKASI

Rabu, 08 Juni 2011

PROGRAM KERJA HARI RABU 8 JUNI '11

HASIL KERJA PROYEK UNILEVER HARI SELASA 7 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - BONGKAR PLAFOND & SENG ZINCALUM & PENEMPATAN BONGKARAN
   - BONGKAR GORDING & PENEMPATANYA
   - PASANG FLASING TALANG DENGAN ATAP EXISTING
   - PASANG PARTISI TERPAL UNTUK PENUTUP LOKASI DENGAN R.PRODUKSI
   - FINISHING GYPSUM PLAFOND & DINDING
   - TANGGA MONYET
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI RABU 8 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - BONGKAR PLAFOND & SENG ZINCALUM & TRANSFER BONGKARAN
   - PASANG FLASING TALANG DENGAN ATAP EXISTING
   - FINISHING GYPSUM PLAFOND & DINDING

   - TANGGA MONYET
   - PEMBERSIHAN LOKASI

Selasa, 07 Juni 2011

PROGRAM KERJA HARI SELASA 07 JUNI 2011

HASIL KERJA PROYEK UNILEVER HARI SENIN 6 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - BONGKAR PLAFOND & SENG ZINCALUM & PENEMPATAN BONGKARAN
   - PASANG FLASING TALANG DENGAN ATAP EXISTING
   - FINISHING CAT PLAFOND & DINDING
   - TANGGA MONYET
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI SELASA 7 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - BONGKAR PLAFOND & SENG ZINCALUM & PENEMPATAN BONGKARAN
   - PASANG FLASING TALANG DENGAN ATAP EXISTING
   - FINISHING GYPSUM PLAFOND & DINDING

   - TANGGA MONYET
   - PEMBERSIHAN LOKASI

Senin, 06 Juni 2011

PROGRAM KERJA HARI SENIN 6 JUNI 2011

RENCANA KERJA PROYEK UNILEVER HARI SENIN 6 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - BONGKAR PLAFOND & SENG ZINCALUM & PENEMPATAN BONGKARAN
   - PASANG FLASING TALANG DENGAN ATAP EXISTING
   - FINISHING CAT PLAFOND & DINDING

   - TANGGA MONYET
   - PEMBERSIHAN LOKASI

Sabtu, 04 Juni 2011

PROGRAM KERJA HARI SABTU 4 JUNI '11

HASIL KERJA PROYEK UNILEVER HARI JUM'AT 3 JUNI 2011 :


> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL & ALAT DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLADING
   - PASANG FLASING LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI SABTU 4 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL & ALAT DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG FLASING LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PASANG GYPSUM, KOMPON, CAT PLAFOND & DINDING
   - PEMBERSIHAN LOKASI

Jumat, 03 Juni 2011

PROGRAM KERJA HARI JUM'AT 03 JUNI '11

HASIL KERJA PROYEK UNILEVER HARI KAMIS 2 JUNI 2011 :


> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL & ALAT DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLADING
   - PASANG LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PEMBERSIHAN LOKASI

RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 3 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL & ALAT DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLADING
   - PASANG FLASING LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PEMBERSIHAN LOKASI

Kamis, 02 Juni 2011

PROGRAM KERJA HARI KAMIS 2 JUNI 2011

HASIL KERJA PROYEK UNILEVER HARI RABU 1  JUNI 2011 :


> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLIPLOCK,
   - PASANG BRACING KOLOM, TREKSTANG
   - PASANG ZINCALUM CLADING
   - PASANG LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PEMBERSIHAN LOKASI

RENCANA KERJA PROYEK UNILEVER HARI KAMIS 2 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLADING
   - PASANG LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PEMBERSIHAN LOKASI

Rabu, 01 Juni 2011

PROGRAM KERJA HARI RABU 1 JUNI '11

HASIL KERJA PROYEK UNILEVER HARI SELASA 31  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLIPLOCK,   - KOORDINASI ORANG SUBKONT PLAFOND MENGENAI TRANSFER MATERIAL
   - PASANG BEGEL TALANG, TALANG STAINLESS STEEL, REPAIR CAT

   - PEMBERSIHAN LOKASI

RENCANA KERJA PROYEK UNILEVER HARI RABU 1 JUNI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLIPLOCK,
   - PASANG BRACING KOLOM, TREKSTANG
   - PASANG ZINCALUM CLADING
   - PASANG LISPLANK
   - KOORDINASI PEMASANGAN RANGKA PLAPOND & TRANSFER MATERIAL
   - PEMBERSIHAN LOKASI

Selasa, 31 Mei 2011

PROGRAM KERJA HARI SELASA 31 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI SENIN 30  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG TREKSTANG, CLIPLOCK,
   - PASANG BEGEL TALANG, LISPLANK, REPAIR CAT
   - PEMBERSIHAN LOKASI

RENCANA KERJA PROYEK UNILEVER HARI SELASA 31 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG ZINCALUM CLIPLOCK,
   - PASANG BEGEL TALANG, TALANG STAINLESS STEEL, REPAIR CAT
   - PEMBERSIHAN LOKASI

Senin, 30 Mei 2011

HASIL KERJA PROYEK UNILEVER HARI MINGGU 29  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG TREKSTANG GORDING, TREKSTANG REGEL,
   - PASANG BEGEL TALANG, LISPLANK
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI SENIN 30 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG TREKSTANG, CLIPLOCK,
   - PASANG BEGEL TALANG, LISPLANK, REPAIR CAT
   - PEMBERSIHAN LOKASI

Minggu, 29 Mei 2011

PROGRAM KERJA HARI MINGGU 29 MEI '11

HASIL KERJA PROYEK UNILEVER HARI SABTU 28  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION LISPLANK, GORDING, REGEL
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI MINGGU 29 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PASANG TREKSTANG GORDING, TREKSTANG REGEL,
   - PASANG BEGEL TALANG, LISPLANK
   - PEMBERSIHAN LOKASI

Sabtu, 28 Mei 2011

PROGRAM KERJA HARI SABTU 28 MEI '11

HASIL KERJA PROYEK UNILEVER HARI JUM'AT 27  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP (LANJUT)
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
   - TRANSFER MATERIAL DARI LOADING DOCK KE LANTAI 2 (OK)
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION RAFTER, BEAM, SUPPORT
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI SABTU 28 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION LISPLANK, GORDING, REGEL
   - PEMBERSIHAN LOKASI

Jumat, 27 Mei 2011

PROGRAM KERJA HARI JUM'AT 27 MEI '11

HASIL KERJA PROYEK UNILEVER HARI KAMIS 26  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP (LANJUT)
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
   - MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION KOLOM
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 27 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION RAFTER, BEAM, SUPPORT
   - PEMBERSIHAN LOKASI

Kamis, 26 Mei 2011

PROGRAM KERJA HARI KAMIS 25 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI RABU 24  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP (LANJUT)
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP (LANJUT)
   - MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
   - BONGKAR PLAFOND & SENG ZINCALUM
   - PERSIAPAN ERECTION KOLOM
   - PEMBERSIHAN LOKASI


RENCANA KERJA PROYEK UNILEVER HARI KAMIS 26 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP
   - TRANSFER MATERIAL DARI LT 2 KE LOKASI ATAP
   - MARKING KUDA2 UNTUK END PLATE KOLOM & PENGEBORAN
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION KOLOM
   - PEMBERSIHAN LOKASI

Rabu, 25 Mei 2011

PROGRAM KERJA HARI RABU 25 MEI '11

HASIL KERJA PROYEK UNILEVER HARI SELASA 24  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)
   - TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT (LANJUT)
   - MARKING KUDA2 UNTUK END PLATE KOLOM (LANJUT)
   - BONGKAR PLAFOND & SENG ZINCALUM (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI RABU 25 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP
   - TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
   - MARKING KUDA2 UNTUK END PLATE KOLOM
   - BONGKAR PLAFOND & SENG ZINCALUM
   - ERECTION KOLOM
   - PEMBERSIHAN LOKASI

Selasa, 24 Mei 2011

PROGRAM KERJA HARI SELASA 24 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI SENIN 23  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)
   - TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI SELASA 24  MEI 2011 :
> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP
   - TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
   - PEMBERSIHAN LOKASI

Senin, 23 Mei 2011

PROGRAM KERJA HARI SENIN 23 MEI 2011

RENCANA KERJA PROYEK UNILEVER HARI SENIN 23  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP 
   - TRANSFER MATERIAL DARI WORKSHOP KE PROYEK UNILEVER
   - TRANSFER MATERIAL DARI LOADING DOCK KE SITE PROJECT
   - PEMBERSIHAN LOKASI

Sabtu, 21 Mei 2011

PROGRAM KERJA HARI SABTU 21 MEI '11

HASIL KERJA PROYEK UNILEVER HARI JUM'AT 20  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - PASANG BOX CULVERT/ U~DITH   (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT  (LANJUT)
   - URUGAN KEMBALI GALIAN  (LANJUT)
   - BIKIN TANDA KABEL 10 BH (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI SABTU 21 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - PASANG BOX CULVERT / GORONG-GORONG  & TUTUP BOX CULVERT
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
   - URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP & TRANSFER MATERIAL BAJA  KE UNILEVER

Jumat, 20 Mei 2011

Roofing work modul - 7, Unilever Project







PROGRAM KERJA HARI JUM'AT 20 MEI '11

HASIL KERJA PROYEK UNILEVER HARI KAMIS 19  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - RABAT LANTAI KERJA CROSSING  (OK)
   - PASANG BOX CULVERT/ U~DITH   (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT  (LANJUT)
   - URUGAN KEMBALI GALIAN  (LANJUT)
   - BIKIN TANDA KABEL 10 BH (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 20 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - PASANG BOX CULVERT / GORONG-GORONG  & TUTUP BOX CULVERT
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
   - URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

Kamis, 19 Mei 2011

PROGRAM KERJA HARI KAMIS 19 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI RABU 18  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (OK)
   - RABAT LANTAI KERJA CROSSING  (OK)
   - PASANG BOX CULVERT/ U~DITH   (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT  (LANJUT)
   - URUGAN KEMBALI GALIAN  (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI KAMIS 19 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - PASANG BOX CULVERT / GORONG-GORONG  & TUTUP BOX CULVERT
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
   - URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

Rabu, 18 Mei 2011

PROGRAM KERJA HARI RABU 18 MEI '11

HASIL KERJA PROYEK UNILEVER HARI SENIN 16  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA CROSSING  (LANJUT)
   - PASANG BOX CULVERT/ U~DITH   (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT  (LANJUT)
   - URUGAN KEMBALI GALIAN  (OK)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI RABU 18 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - GALIAN TANAH DENGAN EXCAVATOR PC 75
   - PASANG BOX CULVERT / GORONG-GORONG   
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
   - URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

Senin, 16 Mei 2011

PROGRAM KERJA HARI SENIN 16MEI 2011

HASIL KERJA PROYEK UNILEVER HARI MINGGU 15  MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA CROSSING JALAN  (LANJUT)
   - PASANG BOX CULVERT/ U~DITH  CROSSING JALAN (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT CROSSING JALAN (LANJUT)
   - URUGAN KEMBALI GALIAN CROSSING JALAN (OK)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP  (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI SENIN 16 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - GALIAN TANAH DENGAN EXCAVATOR PC 75
   - PASANG BOX CULVERT / GORONG-GORONG   
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
   - URUGAN KEMBALI GALIAN
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

Minggu, 15 Mei 2011

PROGRAM KERJA HARI MINGGU 15 MEI '11

HASIL KERJA PROYEK UNILEVER HARI SABTU 14 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - MENURUNKAN COVER BOX CULVERT DARI TRUCK 48 BH
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP

RENCANA KERJA PROYEK UNILEVER HARI MINGGU 15 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - GALIAN TANAH DENGAN EXCAVATOR PC 75 CROSSING JALAN (MENGGANGGU LALU LINTAS MOBIL KELUAR MASUK PROYEK)
   - PASANG BOX CULVERT / GORONG-GORONG CROSSING JALAN   
   - GROUTING SAMBUNGAN BOX CULVERT CROSSING JALAN
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

Sabtu, 14 Mei 2011

PROGRAM KERJA HARI KAMIS 12 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI RABU 11 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP

RENCANA KERJA PROYEK UNILEVER HARI KAMIS 12 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - GALIAN TANAH DENGAN EXCAVATOR PC 75
   - PASANG BOX CULVERT / GORONG-GORONG   
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

PROGRAM KERJA HARI SABTU 14 MEI '11

HASIL KERJA PROYEK UNILEVER HARI JUM'AT 13 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - MENURUNKAN COVER BOX CULVERT DARI TRUCK 56 BH
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORKSHOP

RENCANA KERJA PROYEK UNILEVER HARI SABTU 14 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - GALIAN TANAH DENGAN EXCAVATOR PC 75
   - PASANG BOX CULVERT / GORONG-GORONG   
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - BIKIN TANDA KABEL 10 BH
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - PABRIKASI DI WORK SHOP

Rabu, 11 Mei 2011

PROGRAM KERJA HARI RABU 11 MEI '11

HASIL KERJA PROYEK UNILEVER HARI SELASA 10 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7

RENCANA KERJA PROYEK UNILEVER HARI RABU 11 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - GALIAN TANAH DENGAN EXCAVATOR PC 75
   - PASANG BOX CULVERT / GORONG-GORONG   
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI 
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - RENC. PABRIKASI DI WORK SHOP

Selasa, 10 Mei 2011

PROGRAM KERJA HARI SELASA 10 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI SENIN 09 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7

RENCANA KERJA PROYEK UNILEVER HARI SELASA 10 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - PASANG BOX CULVERT / GORONG-GORONG
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
   - MENURUNKAN BOX CULVERT & TUTUP DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - RENC. PABRIKASI DI WORK SHOP

Senin, 09 Mei 2011

PROGRAM KERJA HARI SENIN 9 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI SABTU 07 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7

RENCANA KERJA PROYEK UNILEVER HARI SENIN 09 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - PASANG BOX CULVERT / GORONG-GORONG
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7
   - RENC. PABRIKASI DI WORK SHOP JIKA MATERIAL TELAH DATANG

Sabtu, 07 Mei 2011

PROGRAM KERJA HARI SABTU 7 MEI '11

HASIL KERJA PROYEK UNILEVER HARI JUM'AT 06 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
   - MENURUNKAN BOX CULVERT DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7

RENCANA KERJA PROYEK UNILEVER HARI SABTU 07 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT / GORONG-GORONG
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7

Jumat, 06 Mei 2011

PROGRAM KERJA HARI JUM'AT 6 MEI '11

HASIL KERJA PROYEK UNILEVER HARI KAMIS 05 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)  
> KOORDINASI PEKERJAAN ROOF MODUL 7

RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 06 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT / GORONG-GORONG
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI
> KOORDINASI PEKERJAAN ROOF MODUL 7

Kamis, 05 Mei 2011

VOOR ROOF MODUL 7 ULI



PROGRAM KERJA HARI KAMIS 5 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI RABU 04 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)
   - LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG (45 BH) (OK)
     DAN TUTUP 20 BH

RENCANA KERJA PROYEK UNILEVER HARI KAMIS 05 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT / GORONG-GORONG
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI
   - MENURUNKAN BOX CULVERT DARI TRUCK
> KOORDINASI PEKERJAAN ROOF MODUL 7

Rabu, 04 Mei 2011

PROGRAM KERJA HARI RABU 4 MEI '11

HASIL KERJA PROYEK UNILEVER HARI SELASA 03 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)
   - LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG (45 BH) (OK)
     DAN TUTUP 20 BH

RENCANA KERJA PROYEK UNILEVER HARI RABU 04 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT / GORONG-GORONG
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI

Selasa, 03 Mei 2011

PROGRAM KERJA HARI SELASA 3 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI SENIN 2 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)
   - MENURUNKAN BOX CULVERT / GORONG-GORONG DARI TRUK (45 BH) (OK)
     DAN TUTUP 20 BH

RENCANA KERJA PROYEK UNILEVER HARI SENIN 03 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - LANGSIR BOX CULVERT / GORONG-GORONG UNTUK DIPASANG
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI

Senin, 02 Mei 2011

PROGRAM KERJA HARI SENIN 2 MEI 2011

HASIL KERJA PROYEK UNILEVER HARI SABTU 30 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI SENIN 02 MEI 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI

Sabtu, 30 April 2011

PROGRAM KERJA HARI SABTU 30 APRIL '11

HASIL KERJA PROYEK UNILEVER HARI JUM'AT 29 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI SABTU 30 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG)---->GROUTING
   - GROUTING SAMBUNGAN BOX CULVERT
   - URUGAN TANAH KEMBALI
   - PEMBERSIHAN LOKASI

Jumat, 29 April 2011

PROGRAM KERJA HARI JUM'AT 29 APRIL '11

HASIL KERJA PROYEK UNILEVER HARI KAMIS 28 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - GALIAN TANAH DENGAN EXCAVATOR PC 75 (SEMENTARA OFF DULU) MENUNGGU BOX CULVERT DATANG
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG) (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)

RENCANA KERJA PROYEK UNILEVER HARI JUM'AT 29 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG)---->GROUTING
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI

Kamis, 28 April 2011

PROGRAM KERJA HARI KAMIS 28 APRIL 2011

HASIL KERJA PROYEK UNILEVER HARI RABU 27 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - GALIAN TANAH DENGAN EXCAVATOR PC 75 (LANJUT)
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN (LANJUT)
   - RABAT LANTAI KERJA (LANJUT)
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG)  (LANJUT)
   - GROUTING SAMBUNGAN BOX CULVERT (LANJUT)
   - PEMBERSIHAN LOKASI (LANJUT)
> KOORDINASI DENGAN PENGAWAS UNILEVER, MENGENAI PENGADAAN GORONG-GORONG PRODUKSI LISA. KITA SAMPAIKAN SCHEDULE PERCEPATAN YANG KITA MINTA DARI PIHAK LISA, HASILNYA PIHAK PENGAWAS TETAP MINTA PRODUKNYA LISA WALAUPUN SCHEDULE AGAK TERLAMBAT (TIDAK MASALAH)
> KOORDINASI DENGAN LOGISTIK UNTUK LISA SUPAYA SEGERA PRODUKSI SESUAI SCHEDULE,
> UNTUK ALAT BERAT KITA STOP DULU SAMPAI PEMASANGAN BOX CULVERT YANG 74 BH INI SELESAI, KEMUDIAN KITA DEMOBILISASI DULU MENUNGGU SAMPAI MATERILAL BOX CULVERT DIKIRIM KE LOKASI UNILEVER.
> UNTUK GALIAN YANG BELUM TINGGAL JALUR YANG MENYEBERANG JALAN.

RENCANA KERJA PROYEK UNILEVER HARI KAMIS 28 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV :
   - GALIAN TANAH DENGAN EXCAVATOR PC 75
   - SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   - RABAT LANTAI KERJA
   - PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG)
   - GROUTING SAMBUNGAN BOX CULVERT
   - PEMBERSIHAN LOKASI

Rabu, 27 April 2011

PROGRAM KERJA HARI RABU 27 APRIL '11

RENCANA KERJA PROYEK UNILEVER HARI RABU 27 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV
   > GALIAN TANAH DENGAN EXCAVATOR PC 75
   > SEDOT AIR DENGAN SUBMERSIBLE DI DALAM GALIAN
   > RABAT LANTAI KERJA
   > PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG)
   > GROUTING SAMBUNGAN BOX CULVERT
   > PEMBERSIHAN LOKASI

Selasa, 26 April 2011

PROGRAM KERJA HARI SELASA 26 APRIL 2011

RENCANA KERJA PROYEK UNILEVER HARI SELASA 26 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV
   > GALIAN TANAH DENGAN EXCAVATOR PC 75
   > RABAT LANTAI KERJA
   > PASANG BOX CULVERT/ U~DITH (BARU 74 BH YANG DATANG)
   > PEMBERSIHAN LOKASI

Senin, 25 April 2011

PROGRAM KERJA HARI SENIN 25 APRIL 2011

RENCANA KERJA PROYEK UNILEVER HARI SENIN 25 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV
   > GALIAN TANAH DENGAN EXCAVATOR PC 75
   > RABAT LANTAI KERJA
   > PASANG GARIS POLICE LINE PEMBATAS GALIAN
   > PEMBERSIHAN LOKASI

Minggu, 24 April 2011

RENCANA KERJA HARI MINGGU 24 APRIL 2011

RENCANA KERJA PROYEK UNILEVER HARI MINGGU 24 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV
   > GALIAN TANAH DENGAN EXCAVATOR PC 75
   > RABAT LANTAI KERJA
   > PEMBERSIHAN LOKASI

RENCANA KERJA HARI SABTU TGL 23 APRIL 2011

RENCANA KERJA PROYEK UNILEVER HARI SABTU 23 APRIL 2011 :

> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PROYEK INSTALL GORONG2 KABEL 20 KV
   > GALIAN TANAH DENGAN EXCAVATOR PC 75
   > RABAT LANTAI KERJA
   > PEMBERSIHAN LOKASI

Kamis, 21 April 2011

PROGRAM KERJA HARI KAMIS 21 APRIL 2011

PROGRAM HARI KAMIS PROYEK UNILEVER :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PEK. INSTALL GORONG2 JALUR KABEL 20 KV
> KOORDINASI DENGAN PENGAWAS UNILEVER UNTUK PERSIAPAN PEKERJAAN ROOF MODUL 7 (TRANSFER, LOADING MATERIAL & METODE PELAKSANAAN)
> KOORDINASI BIKIN OPNAM PEKERJA




TIM UNILEVER

Rabu, 20 April 2011

PROGRAM KERJA HARI SELASA 19 APRIL 2011

PROGRAM KERJA HARI KAMIS 19 APRIL 2011
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PEKERJAAN INSTALL GORONG2
   - UITZET JALUR GORONG2
   - BIKIN GUDANG ALAT
   - KOORDINASI DENGAN ORANG ALAT BERAT
   - KOORDINASI DENGAN PENGAWAS UNTUK PINDAH CONTAINER KARENA MENGHALANGI AREA KERJA
> KOORDINASI PERSIAPAN PEKERJAAN ROOF 7 (METODE & TRANSFER MATERIAL)
> PENGAMBILAN PO UNTUK PEKERJAAN INSTALL GORONG2 KE BUYING

program kerja hari rabu 20 april 2011

PROGRAM KERJA HARI RABU 20 APRIL 2011 :
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN DI UNILEVER
    - UITZET JALUR GORONG2 KABEL
    - BIKIN GUDANG ALAT
    - KOORDINASI ALAT BERAT (MENDATANGKAN EXCAVATOR)
    - KOORDINASI PERMINTAAN BOX CULVERT
> KOORDINASI PERSIAPAN PROYEK MODUL ROOF 7



TIM UNILEVER

Selasa, 19 April 2011

PROGRAM KERJA HARI SELASA 19 APRIL 2011

PROGRAM KERJA HARI KAMIS 19 APRIL 2011
> SAFETY BRIEFING
> KOORDINASI PELAKSANAAN PEKERJAAN INSTALL GORONG2
   - UITZET JALUR GORONG2
   - BIKIN GUDANG ALAT
   - KOORDINASI DENGAN ORANG ALAT BERAT
   - KOORDINASI DENGAN PENGAWAS UNTUK PINDAH CONTAINER KARENA MENGHALANGI AREA KERJA
> KOORDINASI PERSIAPAN PEKERJAAN ROOF 7 (METODE & TRANSFER MATERIAL)
> PENGAMBILAN PO UNTUK PEKERJAAN INSTALL GORONG2 KE BUYING

Install the culvert work 20 kv cable, Unilever Project